On Wed, Dec 11, 2013 at 7:41 AM, Simon Riggs <simon@2ndquadrant.com> wrote:
> That's about 2-3 days work and I know Peter can hack it. So the
> situation is not perfection-sought-blocking-good, this is more like
> fairly poor solution being driven through when a better solution is
> available within the time and skills available.
I think that that's a very optimistic assessment of the amount of work
required. Even by the rose-tinted standards of software project time
estimation. A ton of data is required to justify fundamental
infrastructural changes like that.
--
Peter Geoghegan