On Sat, May 16, 2015 at 11:58:59AM -0400, Tom Lane wrote:
> With feature freeze behind us, I'd like to propose that now is a good
> time for a pgindent run. It's possible we'd need another one before
> 9.5 is branched off from HEAD, but a run now ought to take care of 95%
> of the cleanup needed. I see a couple of advantages to doing it now:
+1 to Magnus's suggestion of doing it after the minor release wrap.
> The only significant downside I can think of is that, if we determine
> that any of the recent feature additions are so sketchy that they need
> to be reverted, having to undo just a portion of the pgindent commit
> before reverting the feature commit would be a pain. But I don't think
> we should optimize on the assumption that that will happen.
Quite so; we'd have lost our way to be optimizing for that.