* Tom Lane (tgl@sss.pgh.pa.us) wrote:
> I would like to propose aiming for a release around April/May 2010 ...
> "in time for PGCon" if you like, but the main point is to have it out
> before people start disappearing for summer break. We've already run
> into problems with scheduling the 8.4 release because of that.
Big +1 from me for having it in time for PGCon.
> Or we could slide the target release date into the fall, but it seemed
> to me that the spring release timeframe worked better (or would have if
> we'd been able to meet it fully).
Agreed.
> Of the schedules Peter mentioned, the only one that has a realistic
> chance of releasing before June is the one with the final commitfest
> starting Feb 1. Even then, we need to do something to prevent that
> fest from expanding the way the last 8.4 fest did. The core committee
> speculated a bit about instituting a rule like "major patches must
> be submitted into a CF before the last one; the last one will only
> accept resubmissions and small patches". But then you have to draw
> the line between major and minor patches.
I liked the general idea of only accepting "already been seen patches"
or "bug-fix only" patches in the last commitfest.
Thanks,
Stephen