4.2. Resource Calculation #
Note
When calculating resources for the manager and agent, consider not only the number of managed DBMS instances, but also the total number of objects in those instances. The total number of objects is the main factor that determines resource consumption.
For the manager:
The required resources for the manager for 10 DBMS instances with 10 thousand objects per instance:
CPU: 2 pcs.
RAM: 2 GB
SSD: 40 GB
The minimum configuration of the server where the manager is deployed (up to 10 instances with 10 thousand objects per instance):
CPU: 2 pcs.
RAM: 4 GB
SSD: 40 GB
Resource calculation table:
| Total Number of Objects in Instances | CPU, pc. | RAM, GB | SSD, GB |
|---|---|---|---|
| up to 1,000,000 | 2 | 4 | 40 |
| up to 6,000,000 | 4 | 8 | 40 |
| up to 10,000,000 | 8 | 16 | 80 |
For the agent:
The required resources for the agent for 1 DBMS instance (up to 100 thousand instance objects):
CPU: 1 pc.
RAM: 512 MB
SSD: 20 GB
The minimum configuration of the server with the DBMS instance where the agent is deployed (up to 100 thousand instance objects):
CPU: 2 pcs.
RAM: 2 GB
SSD: 20 GB
Resource calculation table:
| Number of Objects per Instance | CPU, pc. | RAM, GB | SSD, GB |
|---|---|---|---|
| up to 100,000 | 2 | 2 | 20 |
| up to 200,000 | 3 | 4 | 20 |
| up to 400,000 | 4 | 8 | 20 |
| up to 2,000,000 | 4 | 16 | 40 |